S.no |
Description of work |
Client |
Contract Value(Rs. in lacs) |
1 |
Constructions of M.T. Workshop & Garrages
for light, medium and heavy vehicle parking i/c internal
electrical installation at SSB, Balrampur, UP. |
Executive Engineer,Lucknow Central
Division-IICPWD, 4th Floor, Kendriya Bhawan,Sector-H,
Aliganj, Lucknow, UP |
64 |
2 |
Annual maintance for land scaping &
horticulture work at TCL,Babrala,UP |
M/s Tata Chemicals Ltd,Babrala,UP |
100 |
3 |
Constructions of Various Buildings at 20th
Bn. HQ,SSB, Balrampur ( Sh. Mahila Barrack i/c internal
electrical installation). |
Executive Engineer,Lucknow Central
Division-IICPWD, 4th Floor, Kendriya Bhawan,Sector-H,
Aliganj, Lucknow, UP |
128 |
4 |
Constructions of 17 nos Temporary Barracks
i/c internal electrical installations for BSF at Village
Parmar,Lucknow,UP. |
Executive Engineer,Lucknow Central
Division-IICPWD, 4th Floor, Kendriya Bhawan,Sector-H,
Aliganj, Lucknow, UP |
136 |
5 |
Const. of RCC base Boundary wall at SSB,
Balrampur,UP |
Executive Engineer,Lucknow Central
Division-IICPWD, 4th Floor, Kendriya Bhawan,Sector-H,
Aliganj, Lucknow, UP |
217 |
6 |
Constructions of 10 Bedded Hospital i/c
internal electrical installation at 20th Bn. Head
Quarters Balrampur, UP. |
Executive Engineer,Lucknow Central
Division-IICPWD, 4th Floor, Kendriya Bhawan,Sector-H,
Aliganj, Lucknow, UP |
337 |
7 |
Cvil work CPU building 1 x 500MW Ukai
Tharmal Power Plant Unit no.6,GSECL,TAPI, Gujarat |
M/s BHEL,345 Kingsway, Nagpur |
412 |
8 |
450 MTPD Carbon-dioxide Recovery project
of National Fertilizers Ltd., Vijaipur, Guna, Madhya
Pradesh, India |
M/s Technimont,ICB House, 504, Link Road,
Chincholi Bunder Malad (W),Mumbai-400064 |
468 |
9 |
Civil, Structural and Architectural Works
for Buildings for OPAL Butene 1 Project at Dahej |
M/s Technip KT India Ltd,Technip Tower,A-4,
Sector- 1, |
474 |
10 |
C/o IIITM Campus at Gwalior (Phase – IV).SH
: C/o Departmental Block –V including internal water
supply, Sanitary Installation, drainage including
internal electrical installation & fans, power wiring
,wiring for telephone & fire alarm system. |
Executive Engineer, Gwalior Project
Division, CPWD, Gwalior,MP |
538 |
11 |
Civil st. & Archit. Work for RWBD & CTBD
RO-OMPL,Aromatic complex at Mangalore |
M/s Doshion Velia Solution Pvt. Ltd Plot no.
24, ph-II, GIDC Vatva, Ahemdabad |
597 |
12 |
Development work in Reception Block, Kandi
at Dharamshala, HP |
M/s HPCA, Dhramshala, H.P |
615 |
13 |
Annual maintance for landscaping &
horticulture work for CFCL at Gadepan,Kota,Rajasthan |
M/s CFCL, Gadepan, Kota, Rajasthan |
750 |
14 |
Township Expansion – Addition of C & D type
houses and Extension of School building at CFCL, P.O.
Gadepan, Dist. Kota (Rajasthan) |
M/s CFCL, Gadepan, Kota, Rajasthan |
777 |
15 |
C/o Development of infrastructure for SSB,
20th Bn., Head Quarter at Balrampur. SH : C/o
44 Nos. Type- III, 6 Nos. Type-IV and 2 Nos. Type-V
Family Quarters including development works such as UGT,
Rain Water harvesting, Site Office, Electrical Sub
Station, Leveling, Roads, Water Supply and Sewer Line
etc |
Executive Engineer, Lucknow Central
Division-IICPWD, 4th Floor, Kendriya Bhawan, Sector-H,
Aliganj, Lucknow, UP |
1158 |
16 |
C& ST. work for
balance of Delayed coker unit project (DCU) for MRPL,at
Mangalore |
M/s Toyo
Engineering India LTd., Toyo House, LBS Marg, Kanjur
Marg (W) Mumbai- |
1460 |
17 |
C/o. 264 Nos.
Type-II, 44 Nos. Type-III, 6 Nos. Type-IV & 2 Nos.
Type-V, Quarters at 20TH Battalion, S.S.B., Balarampur,
(SH: C/o. 264 Nos. Type-II Quarters i/c internal water
supply, sanitary, installation, drainage & internal
electrical installation. |
Executive
Engineer,Lucknow Central Division-IICPWD, 4th Floor,
Kendriya Bhawan,Sector-H, Aliganj, Lucknow, UP |
2086 |
18 |
Civil works for Plant Buildings at Opal,
Dahej, Gujarat |
M/s FERNAS Construction India Pvt. Ltd.Cyber
Terrace, Building No-5, Tower-B,16th Floor, Phase III,
DLF Cyber City,Gurgaon, Haryana- |
2196 |
19 |
Const. of Boys Hostel No. V at IIIT,
Allahabad, i/c elect. Installation & fans |
EE, Allahabad Central Devision CPWD,
76-Lukerganj Allahabad |
2568 |
20 |
Computer Center -IIIT at Allahabad U.P. |
Executive Engineer, CPWD, Allahabad |
2804 |
21 |
Widening & Strengthing of Una - Ner Chowk
Road, Section: Jahu - Kalkhar Road ( KM- 93+440 TO
108+830) H.P |
HPRIDC, SHIMLA |
3350 |
22 |
Constr. of Academic Block & Administative
block build. For R.G. IIIT, Amethi (U.P) i/c internal
elect. Instal. And fans. |
SE Kanpur central div CPWD, Kanpur |
3959 |
23 |
Construction of Processing Road at
MSEZ,Mangalore,Karnataka |
M/s Technical Head, MSEZ, Mangalore,
Karnataka |
4599 |
24 |
Const. of distributaries, Minors and sub minors of Umraha Branch Canal, Bariyarpur left Canal of B.L.C. Project on Turnkey Basis, comprising the work of survey, fixing of ref. pillers at 100 mtr apart. Planning, Design, Estimate etc complete at Bariyarpur M.P. |
Executive Engineer Bariyarpur Canal Div-2, Chhatarpur M.P. |
5253 |
25 |
Construction of
Cement Concrete Lining work for (0 to 49) km of main
canal of Briyarpur, MP |
Executive Engineer
Bariyarpur Canal Div-2, Chhatarpur M.P. |
5488 |
|
|
|
|